Customization: | Available |
---|---|
Type: | Air Jet Loom |
Voltage: | 380V |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model No. | KSA-706 | Weft Insertion | Main, Auxiliary Nozzle with Profiled Reed Electromagnetic Valve Control |
Condition | New | Shedding | 2688 pin, 5012 pin, Electronic Jacquard Shedding |
Reed Space |
190,230,280,340,360 (cm) | Let-Off | Electronic Let-off, Disk Diameter 800 (Ф 914) Lake-Up: Electronic, Maximum Roll Diameter 600 |
Weft Selection | Double, Four, or Six Nozzles Tree Weft Selection Power: Super Start, through Electromagnetic Brake, angle Parking | Beating-Up | Six Linkage Beating-up |
Motor | 5.5kW, 6.5kw, 7.5kw | Selvage | Planetary Leno Edge |
Speed | 350-650rpm | Cutter | Mechanical ( Middle Scissors can be Added) |
Oil Supply | Oil Bath Type for the Big Box, Box, Let-off, Take-up Box the Other by Centralized Supply |
.Spark is committed to offering high-quality spare parts to deliver maximum productivity with minimum downtime.
.Our experienced technicians are skilled in offering technical support and training services to help your weaving looms remain efficient and stable.
.Provide 24-hour service.
Q: Are you a manufacturer or trading company?
A: We are a professional manufacturer holding our own International Trade Department with self import&export right
Q: Are you available for an on-the-spot invitation?
A: We warmly welcome our new and old friends to visit our company for detailed negotiation.
Meanwhile, we would send our exposition and relative information to promote a face-to-face meeting.
Q: Is the price offered changeable?
A: We always offer a reasonable price for every customer at the beginning, and the price can be changeable according to the purchasing quantity.
Q: How about the quality?
A: The main subassembly and raw materials are all supplied by large and skilled companies. The main key parts are researched & developed and machined by our own staff with professional assembly line work and a strict quality test system to meet your high-quality requirement.
Q: How's the after-sale service?
A: We provide well-trained and professional engineers available to service overseas.
Q: What about the delivery time?
A: Normally the delivery time is 20 days after getting the down payment. If the order is small and we have some looms in stock, the delivery time is 10-15 days. If our factory is busy with many orders in hand, the delivery time will be negotiable or as per our production plan.